PLANS & PERMIT ASSISTANCE · MELBOURNE
Unapproved building work? Start with a clear picture.
You may have discovered an unapproved structure, inherited an incomplete set of records or received a building notice. We help organise the drawing side of the response and document the existing work and any agreed proposed changes.
Discuss Your ProjectUnderstand the pathway before commissioning plans
Existing unapproved work needs a property-specific assessment. A new set of drawings does not by itself legalise a structure or establish that it can remain. Ask the council or relevant building surveyor what information and action are required.
If a building notice or order has been issued, keep the complete document and follow its response dates. A notice gives an opportunity to make representations; an order can require action. Engaging a drafting service does not extend those dates.
Official guidance: Ararat Rural City Council: illegal building works · BPC: building notices and building orders
Situations we can help document
- A deck, verandah, shed, carport or other structure with missing approval records.
- Work carried out by a previous owner that needs to be recorded.
- Existing layouts requested by council, an engineer or a building surveyor.
- Proposed alterations or rectification arising from a professional assessment.
- Drawing information needed while preparing to sell or change a property’s use.
- A clear distinction between existing construction and proposed work.
Common mistakes when responding to unapproved work
- Assuming the age of a structure means it is approved or exempt.
- Treating a drawing or engineer’s report as a permit or council decision.
- Leaving out notice attachments, response dates or earlier correspondence.
- Commissioning construction or demolition before the required assessment and authorisation.
What your documentation package can include
We start with the written request, the information available and the purpose of each drawing. Measurements, inspection, engineering and legal advice are separate inputs where needed.
- Existing site plans, floor plans and elevations from suitable information.
- Sections and dimensions requested for the assessment.
- Proposed rectification or alteration drawings based on professional advice.
- Coordinated drawing revisions responding to agreed review comments.
How we assist with the next approval step
Axial can help prepare drawings and coordinate the supporting documents requested by your appointed professionals. Where a building permit is required for proposed rectification work, we can assist with the application within an agreed and authorised scope.
The council or relevant building surveyor determines the assessment and required action. Engineering, certification and regulated services remain with appropriately registered professionals. Outcomes may involve changes to the work; we do not promise that an existing structure can remain.
How the roles fit together
Your brief
The property, your ideas and any written requirements.
Axial’s assistance
Agreed drawings, supporting information and application help.
Surveyor assessment
Your appointed building surveyor assesses the application and decides whether a permit can be issued.
What to send with your enquiry
Send the property suburb, photographs, available drawings and the complete notice, order or written request. Include any known permit history and professional reports, and flag the response date at the start of your enquiry.
Agree the scope against the written requirements
The number of drawings, missing measurements and extent of proposed changes affect cost and timing. We confirm our availability after reviewing the documents. Council decisions, consultant assessments and any building work have separate timeframes.
Questions about this service
Can you obtain a retrospective building permit?
A building permit cannot be issued retrospectively for completed work. We can help with the drawings requested for an assessment and, where applicable, documentation and application assistance for proposed rectification work.
What if a previous owner carried out the work?
Send the documents and records you have. The council or building surveyor can clarify the property’s requirements; we can then agree the drawing support. For sale or responsibility questions, obtain advice from your conveyancer or solicitor.
Can you guarantee the building notice will be cancelled?
No. The issuing authority makes that decision. Our commitment is to the agreed drafting work, clear coordination and correction of our drafting errors.
Official resources
- Ararat Rural City Council: illegal building works
- BPC: building notices and building orders
- BPC: appointing a building surveyor
Guidance checked . This is a general introduction; confirm the requirements for your property with council and the relevant building surveyor.
YOUR NEXT STEP
Let’s work through your project.
Send your suburb, ideas and any plans or written requirements. We’ll discuss the drawings and building-permit assistance suitable for your scope.
Discuss Your Project